| Os motores de busca de Datasheet de Componentes eletrônicos |
|
LTC1290 Folha de dados(PDF) 27 Page - Linear Technology |
|
|
|||||||||||||||||||||||||||||
LTC1290 Folha de dados(HTML) 27 Page - Linear Technology |
|
27 / 28 page ![]() 27 LTC1290 S APPLICATI TYPICAL Power Shutdown For battery-powered applications it is desirable to keep power dissipation at a minimum. The LTC1290 can be powered down when not in use reducing the supply current from a nominal value of 5mA to typically 5 µA (with ACLK turned off). See the curve for Supply Current (Power Shutdown) vs ACLK if ACLK cannot be turned off when the LTC1290 is powered down. In this case the supply current is proportional to the ACLK frequency and is independent of temperature until it reaches the magnitude of the supply current attained with ACLK turned off. As an example of how to use this feature let’s add this to the previous application, SNEAK-A-BIT. After the CHK SIGN subroutine call insert the following: • • JSR CHK SIGN Determines which reading has valid data, converts to 2’s complement and stores in RAM JSR SHUTDOWN LTC1290 power shutdown routine The actual subroutine is: SHUTDOWN: LDA #$3D Load DIN word for LTC1290 into ACC JSR TRANSFER Read LTC1290 routine RTS Return To place the device in power shutdown the word length bits are set to WL1 = 0 and WL0 = 1. The LTC1290 is powered up on the next request for a conversion and it’s ready to digitize an input signal immediately. Power Shutdown Timing Considerations After power shutdown has been requested, the LTC1290 is powered up on the next request for a conversion. This request can be initiated either by bringing CS low or by starting the next cycle of SCLKs if CS is kept low (see Figures 3 and 4). When the SCLK frequency is much slower than the ACLK frequency a situation can arise where the LTC1290 could power down and then prema- turely power back up. Power shutdown begins at the negative going edge of the 10th SCLK once it has been requested. A dummy conversion is executed and the LTC1290 waits for the next request for conversion. If the SCLKs have not finished once the LTC1290 has finished its dummy conversion, it will recognize the next remaining SCLKs as a request to start a conversion and power up the LTC1290 (see Figure 23). To prevent this, bring either CS high at the 10th SCLK (Figure 24) or clock out only 10 SCLKs (Figure 25) when power shutdown is requested. 110 SCLK CS POWER SHUTDOWN STARTS DUMMY CONVERSION FINISHES AFTER 52 ACLK PERIODS POWER UP 1290 TAF23 Figure 23. Power Shutdown Timing Problem 110 SCLK CS POWER SHUTDOWN STARTS DUMMY CONVERSION FINISHES AFTER 52 ACLK PERIODS POWER UP 1290 TAF24 Figure 24. Power Shutdown Timing 110 SCLK CS POWER SHUTDOWN STARTS DUMMY CONVERSION FINISHES AFTER 52 ACLK PERIODS POWER UP 1290 TAF25 Figure 25. Power Shutdown Timing Information furnished by Linear Technology Corporation is believed to be accurate and reliable. However, no responsibility is assumed for its use. Linear Technology Corporation makes no represen- tation that the interconnection of circuits as described herein will not infringe on existing patent rights. |
|
Ligação URL |
| ALLDATASHEET é útil para você? [ DONATE ] |
Sobre Alldatasheet | Publicidade | Contato conosco | Privacy Policy | Link para a ficha técnica | roca de Link | Lista de Fabricantes All Rights Reserved©Alldatasheet.com |
| Russian : Alldatasheetru.com | Korean : Alldatasheet.co.kr | Spanish : Alldatasheet.es | French : Alldatasheet.fr | Italian : Alldatasheetit.com Portuguese : Alldatasheetpt.com | Polish : Alldatasheet.pl | Vietnamese : Alldatasheet.vn Indian : Alldatasheet.in | Mexican : Alldatasheet.com.mx | British : Alldatasheet.co.uk | New Zealand : Alldatasheet.co.nz |
|
Family Site : ic2ic.com |
icmetro.com |